Overview

The original building was constructed in 2020 and consisted of 3,200 SF office space of conventional construction to systematically manage order processing with an attached 8,400 SF pre-engineered metal building warehouse to house storage and distribution operations. Spaces include office area, part storage, part washing, workshop area and shipping. In 2023 a 3,500 SF addition to the warehouse was designed and is under construction to increase the storage capacity for the facility.

Scope of Services

  • ­Programming and planning
  • ­Architectural design and documentation
  • ­Project management
  • ­Landscape architecture and site planning
  • ­Interior design and documentation
  • ­3D imagery / BIM
  • ­Construction documents
  • ­Construction administration

Design Features

  • ADA accessibility
  • Roofing / windows
  • Loading dock