CPI Process Systems Distribution Center

Project Details
Overview
The original building was constructed in 2020 and consisted of 3,200 SF office space of conventional construction to systematically manage order processing with an attached 8,400 SF pre-engineered metal building warehouse to house storage and distribution operations. Spaces include office area, part storage, part washing, workshop area and shipping. In 2023 a 3,500 SF addition to the warehouse was designed and is under construction to increase the storage capacity for the facility.
Scope of Services
- Programming and planning
- Architectural design and documentation
- Project management
- Landscape architecture and site planning
- Interior design and documentation
- 3D imagery / BIM
- Construction documents
- Construction administration
Design Features
- ADA accessibility
- Roofing / windows
- Loading dock
Project Gallery










